Client / Project | Project Scope | Year |
---|---|---|
IC-Limak | Rehabilitation on EPC Turnkey basis of 1050 MW thermal power plant. | - |
Azerenergy | Erection Supervision, Commissioning, and Start-up of Janub 750 MW Combined Cycle Power Plant (group ref. with GKE Energy) | 2014 |
EUAS | Modernization of Ambarlı 810 MWe Combined Cycle Power Plant including Steam Turbine, Generator Control, and new I&C systems; Mechanical rehabilitation and DCS implementation. | 2012 |
ATAER ENERGY | Supply & Erection of Heat Recovery Steam Boiler (OTSG), air-cooled condenser; complete plant engineering and control system extension for Izmir 60 MWe Combined Cycle Power Plant. | 2010 |
ENTEK ENERGY | Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG) and electrical/mechanical Balance of Plant including civil works for Izmit 60 MWe Combined Cycle Co-generation Plant Extension. | 2009 |
CERKEZKOY & NAR ENERGY | Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG), electrical/mechanical Balance of Plant including 5 km underground steam piping at Cerkezkoy 48 MWe Co-generation Power Plant. | 2009 |
SISECAM GROUP SODA INDUSTRY | Replacement of 11X fuel oil burners with Natural Gas burners in 3X boilers (460T/H total) at Mersin Soda Factory. | 2009 |
DOGA ENERGY | Supply and installation of natural gas heating system for 3X GE Frame 6 Gas Turbines. | 2008 |
CTU CONSORTIUM, Switzerland | Design and manufacturing of heat recovery steam boiler (6T/H) for Bromine Recovery Unit Plant. | 2008 |
SKODA POWER, Czech | Civil works for Erdemir 40 MWe Steam Turbine Generator Extension, including steam turbine foundation, power house, control building, and HDPE sea water cooling lines. | 2007 |
EKON, Turkey | Engineering, manufacturing, installation, and commissioning of Askale Fuel Oil Treatment Plant. | 2007 |
OYAK EKON PROKON, Turkey | Engineering, procurement, erection, and commissioning of 2X Steam Boilers (75T/H each) and 2X Siemens Steam Turbines (8.2 MWe each) for Kayseri Bogazliyan Sugar Factory. | 2007 |
MASTIR ENERGY, Turkey | Engineering, supply, installation, and commissioning of Deaerator (53m3) for steam boiler (135T/H) at Eren Corlu Power Plant. | 2007 |
ENERJISA, Turkey | Design, manufacturing, supply & installation of heating coils for auxiliary boilers at Kentsa Power Plant. | 2006 |
Client / Project | Project Scope | Year |
---|---|---|
PALMET ENERGY | Simple & Combined Cycle Power Plant Engineering, Project Management for 60 MWe Combined Cycle Power Plant. | 2012 |
EKON PROKON | Basic Detailed Engineering of 2X Siemens SGT 5-4000F GT, 2X HRSG, Rehabilitation of 2X 150 MWe existing Steam Turbines for Ambarli Repowering. | 2012 |
ZORLU ENERGY | Basic and Detailed Engineering of GE LM 6000 GT, HRSG, Steam Turbine, ACC and Auxiliary Equipment for Luleburgaz 65 MWe CCPP Extension. | 2011 |
AKSA ENERGY | Basic & Detailed Engineering of 4X GE LM 6000 GT, 4X HRSG (OTSG), 2X GE ST, 2X Siemens SGT 5-4000F GT, 250 MWe Steam Turbine, Cooling Systems & Auxiliary Equipment for Antalya 1000 MWe Power Plant. | 2011 |
UGUR ENERGY | Simple & Combined Cycle Power Plant Engineering, System Siemens PCS7 Plant Control System Supply for Cerkezkoy 65 MWe Combined Cycle PP. | 2010 |
ATAER ENERGY | Basic and Detailed Engineering of GE LM 6000 GT, HRSG (OTSG), Steam Turbine, ACC & Auxiliary Equipment for Izmir 60 MWe CCPP Extension. | 2010 |
ENTEK ENERGY | Complete Combined Cycle Power Plant Engineering for Izmit 60 MWe Combined Cycle Co-generation Plant Extension. | 2009 |
SADELMI SPA | Basic and Detailed Engineering for relocation of ABB GT, Heat Recovery Steam Boiler from Izmit to Tupras Aliaga for Entek Power Plant Relocation. | 2007 |
ZORLU ENERGY, Russia | Engineering Management Services for Combined Heat & Power Plants for Kozhukhovo, Tereshkova 2X 170 MWe Combined Heat & Power Plants. | 2007 |
AKSA ENERGY | Stress Analysis for DN300 Steam Piping for Samsun Power Plant. | 2007 |
OZTAS CONSTRUCTION | Engineering Services for Corum Natural Gas Compressor Station at Botas Corum Natural Gas Compressor Station. | 2007 |
BOSEN | Basic and Detailed Engineering of GE LM 6000 GT, HRSG, Steam Turbine, cooling system and Auxiliary Equipment for Bursa 63 MWe CCPP Extension. | 2006 |
ERGAZ | Detailed Engineering of 2X GE Frame 6B Gas Turbine Inlet Air Cooling Systems (chiller) for Enerjisa Adana Combined Cycle Power Plant. | 2006 |
CERKEZKOY & NAR ENERGY | Basic and Detailed Engineering of GE LM 6000 GT, Heat Recovery Steam Boiler (OTSG), Underground Steam Distribution Piping for Cerkezkoy 48 MWe Co-generation PP. | 2006 |
GAMA POWER SYSTEMS | Design, Engineering and I & C of Heat Recovery Steam Boilers for Entek Bursa & Iztek Izmit CCPPs, Erdemir Power Plant, Tupras Izmit Refinery. | 2006 |
CALIK ENERGY, Turkmenistan | Basic Engineering for proposal for Buzmein Combined Cycle Power Plant. | 2005 |
Client / Project | Project Scope | Year |
---|---|---|
OMV, Austria | Long Term Service agreement for the Plant Control and Instrumentation, Auxiliary Boilers, Heat Exchanging Equipment at Samsun Power Plant. | 2013 |
AZERENERGY, Azerbaijan | Erection Supervision, Complete Commissioning of the plant, and Start-up for Sirvan Power Plant. | 2012 |
EKON PROKON, Turkey EUAS Ambarlı 810MWe Combined Cycle Power Plant Repowering | Modernization of Steam Turbine and Generator Control and Protection System, including new I&C, new Mechanical Scope, Steam Turbine Hall Mechanical Rehabilitation Works, Implementation of Plant DCS System, Plant Field Instrumentation, Supply of LV Systems, and Installation & Commissioning of the Whole Electrical Balance of Plant. | 2012 |
ATAER ENERGY | Supply, Erection, Commissioning of Heat Recovery Steam Boiler (OTSG), air-cooled condenser, complete plant engineering, plant control system supply & implementation for Izmir 60 MWe Combined Cycle Power Plant Extension. | 2010 |
ENTEK ENERGY | Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG), and electrical/mechanical Balance of Plant including equipment foundations & complete civil works, complete plant engineering & control system extension for Izmit 60 MWe Combined Cycle Co-generation Plant Extension. | 2009 |
OYAK EKON PROKON | Engineering, procurement, erection, and commissioning of 2x Steam Boilers (75T/h each), 2x Siemens Steam Turbines (8.2 MWe each), and auxiliaries, including boiler control system for Kayseri Bogazliyan Sugar Factory. | 2007 |
UNIT INTERNATIONAL | Commissioning of instrumentation and Control System of 3x Siemens SGT 5-4000F GT Power Plant at Rudeshur 750 MWe Power Plant. | 2005 |
AKENERJI | Start-up & Commissioning of 3x 120 t/h Dual fuel steam boilers, 2 x HSRGs at Yalova Power Plant. | 2004 |
AKENERJI | Start-up & Commissioning of 3x 11 t/h HRSGs at Uşak Power Plant. | 2003 |
AKENERJI | Start-up & Commissioning of 2x 11 t/h HRSGs at Denizli Power Plant. | 2002 |
Client / Project | Project Scope | Year |
---|---|---|
UGUR ENERGY | Automation of CCPP including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), 1X Steam Turbine and BOP; Design, Implementation, Supply and Start-up for Cerkezkoy Combined Cycle Power Plant. | 2011 |
ATAER ENERGY | Automation of CCPP extension including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG) and BOP; Design, Implementation, Supply and Start-up for Izmir Combined Cycle Power Plant Extension. | 2011 |
AKENERJİ | Wireless Data Communication Project for Uluabat Hydroelectricity Power Plant. | 2011 |
TERMO HEAT | Implementation, Start-up & Commissioning of Siemens S7-3XX Boiler Control System for Sivas-Kangal EUAS Power Plant. | 2011 |
ISTAC | Control System Re-programming, Implementation, Start-up, and Commissioning of 1X Fired Steam Boiler Burner Management System with Combustion Control and BOP for Odayeri Waste to Heat Plant. | 2010 |
ENTEK ENERGY | RF Data Communication System, Design, Supply and Commissioning for Bursa Power Plant. | 2009 |
ENTEK ENERGY, Turkey | I & C Engineering and Commissioning Supervision of CCPP extension including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), and BOP for Izmit Combined Cycle Co-generation Plant. | 2009 |
ISKENDERUN IRON & STEEL FACTORY | Instrumentation & Automation of Slab Casting O2 Gas Pressure Reducing System, Supply and Start-up for O2 Pressure Reducing Station. | 2009 |
ADVANSA | Control System Implementation and Start-up for CIPS Transfer System at Adana Power Plant. | 2009 |
OZG ENERGY | Fuel oil Storage and Distribution System Instrumentation Engineering and Supply for Hamitabat Power Plant. | 2008 |
ADVANSA | 2X HT Boiler Control System Design, Engineering including Burner Management System, and Start-up at Adana Power Plant. | 2008 |
DOGA ENERGY | Monitoring System for Liquid Fuel Pressures of the Gas Turbines at Bahcesehir Power Plant. | 2008 |
ENERJISA | Isochronous Mode Scenarios Between Generators, Load Sharing, Load Shedding Automation at Izmit Combined Cycle Power Plant. | 2008 |
ISKENDERUN IRON & STEEL FACTORY | Electrical, Automation, Instrumentation and Control Works for Water Network Control & Monitoring. | 2008 |
KONYA SUGAR | Electrical Systems & Automation of Pulp Drying Facility, Thin Juice Decalcification Unit and Lime Kiln at Cumra Sugar Factory. | 2008 |
AKENERJI | ABB Remote Terminal Unit (RTU) Data Exchange System at Aksa Akal Factory. | 2008 |
SCA SELKASAN | Automation of Steam Boiler, Heat Recovery Steam Boiler and BOP; Design, Engineering including Burner Management System, Implementation, Supply and Start-up for SCA Selkasan Manisa Power Plant. | 2008 |
ISKENDERUN IRON & STEEL FACTORY | Turn-key Design, Implementation, Supply and Start-up of 6X O2, Ar, H2 Pressure Reducing Stations, Control & Monitoring System, and additional operator stations for Slab Casting Plant O2 Pressure Reducing Station. | 2007 |
SADELMI SPA | Distributed Control System, Supply, Engineering, Commissioning & Start-up of Heat Recovery Steam Boiler for Aliaga Power Plant. | 2007 |
TERMO HEAT | Burner Management System for 2 X Double Fuel Burners, 4X Single Fuel Burners, Boiler Control System for 4X Boilers (Siemens S7-300) at Agri Sugar Factory. | 2007 |
CERKEZKOY & NAR ENERGY | Design, Supply, Engineering, Commissioning & Start-up of Distributed Control System for Cerkezkoy 48MWe Co-generation PP Plant. | 2006 |
AKENERJI | Supply, Engineering, Commissioning & Start-up of Distributed Control System for 9X Co-generation Power Plants. | 2002 / 2006 |
ERDEMIR | Modernization of Distributed Control System for Oxygen Plant #5. | 2006 |
HABAS | Distributed Control System, Supply, Engineering, Commissioning & Start-up for Aliaga 230MWe Combined Cycle Power Plant. | 2006 |
OYAK EKON PROKON | Complete Power Plant Distributed Control System, Supply, Engineering, Commissioning & Start-up for Kayseri Sugar Factory Power Plant. | 2006 |
MILTEN | Boiler Automation System. | 2006 |
GAZ TEKNIK - SASA | Burner Management System for 11X Double Fuel Burners, Individual Vaporizer for Control System & Redundant, Master Control System for 9X Vaporizers at Adana Polyesther Industrial Plant. | 2005 |
SISECAM GROUP SODA INDUSTRY | Distributed Control System, Supply, Engineering, Commissioning & Start-up for Burner Replacement of 3X Boilers. | 2005 |
KAREGE | Distributed Control System, Supply, Engineering, Commissioning & Start-up of 3X HRSG & Balance of Plant for Kemalpasa Power Plant. | 2005 |
OZTAS | Distributed Control System, Supply, Engineering, Commissioning & Start-up of HRSG, Balance of Plant & 34.5 kV Switchyard Systems for Etibor-Emet 10MWe Co-generation Power Plant NG Conversion. | 2005 |
GAMA POWER SYSTEMS | Design, Supply, Implementation of Boilers Control Systems and Boiler Management System for Adana Power Plant. | 2005 |