References

EPC/EPCM References

Customer / ProjectProject ScopeYear
IC-Limak
Yeniköy Kemerköy Coal Fired Power Plant (group ref.with GKE Energy)
Rehabilitation on EPC Turnkey basis of 1050 MW thermal power plant.
-
Azerenergy
Janub 750 MW Combined Cycle Power Plant (group ref.with GKE Energy)
Erection Supervison, Commissioning and Start up.
2014
EUAS
Ambarlı 810MWe Combined Cycle Power Plant
Modernization of Steam Turbine and Generator Control and
Protection System including new I&C and new Mechanical Scope;
Steam Turbine Hall Mechanical Rehabilitation Works;
Implementation of Plant DCS System;
Plant Field Instrumentation; Supply of LV Systems and
Installation & Commissioning of Whole Electrical Balance of Plant
2012
ATAER ENERGY
Izmir 60MWe Combined Cycle Power Plant
Supply & Erection of Heat Recovery Steam Boiler (OTSG), air cooled condenser;
complete plant engineering;
plant control system supply & implementation of the extension of existing power plant
2010
ENTEK ENERGY
Izmit 60MWe Combined Cycle Co-generation Plant Extension
Turn-key construction of GE LM 6000 Gas Turbine,
Heat Recovery Steam Boiler (OTSG) and electrical/mechanical Balance of Plant
including equipment foundations & complete civil works;
complete plant engineering & control system extension
2009
DOGA ENERGY
Natural Gas Heating System
Supply and installation of natural gas heating system for 3X GE Frame 6 Gas Turbines
2008
CTU CONSORTIUM, Switzerland
Bromine Recovery Unit Plant
Design and manufacturing of heat recovery steam boiler (6T/H)
2008
SKODA POWER, Czech
Erdemir 40MWe Steam Turbine Generator Extension
Civil works including elevated steam turbine foundation, power house building,
control building, HDPE sea water cooling lines, cable & pipe bridges
2007
EKON, Turkey
Askale Fuel Oil Treatment Plant
Engineering, manufacturing, installation and commissioning of fuel oil treatment plant
2007
OYAK EKON PROKON, Turkey
Kayseri Bogazliyan Sugar Factory
Engineering, procurement, erection and commissioning of
2X Steam Boilers (75T/H ea.),
2X Siemens Steam Turbines (8.2MWe ea.) & auxiliaries including boiler control system.
2007
MASTIR ENERGY, Turkey
Eren Corlu Power Plant
Engineering, supply, installation and commissioning of Dearator (53m3) for steam boiler (135T/H).
2007
ENERJISA, Turkey
Kentsa Power Plant Auxiliary Boiler Extension
Design, manufacturing, supply & installation of heating coils for auxiliary boilers
2006
CERKEZKOY & NAR ENERGY
Cerkezkoy 48MWe Co-generation Power Plant
Turn-key construction of GE LM 6000 Gas Turbine,
Heat Recovery Steam Boiler (OTSG) and electrical/mechanical balance of
plant including equipment foundations and complete civil works;
complete plant engineering & control system supply;
5 km self isolated underground steam distribution piping, instrumentation & control sys.
2009
SISECAM GROUP SODA INDUSTRY
Burner Replacement of 3X Boilers for Mersin Soda Factory
Replacement of 11X fuel oil burners of 3X boilers (460T/H total) with Natural Gas,
including all fuel trains & control system
2009
Showing entries (filtered from total entries)

Engineering References

Customer / ProjectProject ScopeYear
PALMET ENERGY
60MWe Combined Cycle Power Plant
Simple & Combined Cycle Power Plant Engineering, Project Management
2012
EKON PROKON
Ambarli Repowering
Basic Detailed Engineering of
2X Siemens SGT 5- 4000F GT,
2X HRSG,
Rehabilitation of 2X 150MWe existing Steam Turbines
2012
ZORLU ENERGY
Luleburgaz 65MWe CCPP Extension
Basic and Detailed Engineering of GE LM 6000 GT,
HRSG, Steam Turbine, ACC and Auxiliary Equipment
2011
AKSA ENERGY
Antalya 1000MWe Power Plant
Basic & Detailed Engineering of
4X GE LM 6000 GT,
4X HRSG (OTSG),
2X GE ST,
2X Siemens SGT 5- 4000F GT,
2X HRSG, 250MWe Steam Turbine, Cooling Systems & Auxiliary Equipment
2011
UGUR ENERGY
Cerkezkoy 65MWe Combined Cycle PP
Simple & Combined Cycle Power Plant Engineering,
System Siemens PCS7 Plant Control System Supply
2010
ATAER ENERGY
Izmir 60MWe CCPP Extension
Basic and Detailed Engineering of GE LM 6000 GT, HRSG (OTSG),
Steam Turbine, ACC & Auxiliary Equipment
2010
ENTEK ENERGY
Izmit 60MWe Combined Cycle Co-generation Plant Extension
Complete Combined Cycle Power Plant Engineering
2009
SADELMI SPA
Entek Power Plant Relocation
Basic and Detailed Engineering for relocation of ABB GT,
Heat Recovery Steam Boiler from Izmit to Tupras Aliaga
2007
ZORLU ENERGY, Russia
Kozhukhovo, Tereshkova 2X 170MWe Combined Heat & Power Plants
Engineering Management Services for Combined Heat & Power Plants
2007
AKSA ENERGY
Samsun Power Plant
Stress Analysis for DN300 Steam Piping
2007
OZTAS CONSTRUCTION
Botas Corum Natural Gas Compressor Station
Engineering Services for Corum Natural Gas Compressor Station
2007
BOSEN
Bursa 63MWe CCPP Extension
Basic and Detailed Engineering of GE LM 6000 GT, HRSG,
Steam Turbine, cooling system and Auxiliary Equipment
2006
ERGAZ
Enerjisa Adana Combined Cycle Power Plant
Detailed Engineering of 2X GE Frame 6 B Gas Turbine Inlet Air Cooling Systems (chiller)
2006
CERKEZKOY & NAR ENERGY
Cerkezkoy 48MWe Co-generation PP
Basic and Detailed Engineering of GE LM 6000 GT, Heat Recovery Steam Boiler (OTSG),
Underground Steam Distribution Piping
2006
GAMA POWER SYSTEMS,
Entek Bursa & Iztek Izmit CCPPs
Erdemir Power Plant
Tupras Izmit Refinery
Design, Engineering and I & C of Heat Recovery Steam Boilers
2006
CALIK ENERGY, Turkmenistan
Buzmein Combined Cycle Power Plant
Basic Engineering for proposal
2005
Showing entries (filtered from total entries)

Operation and Maintenance References

Customer / ProjectProject ScopeYear
OMV, Austria
Samsun Power Plant
Long Term Service agreement for the Plant Control and Instrumentation,
Auxiliary Boilers, Heat Exchanging Equipment
2013
AZERENERGY, Azerbaijan
Sirvan Power Plant
Erection Supervision, Complete Commissioning of the plant and Start-up2012
EKON PROKON PROKON, Turkey EUAS Ambarlı 810MWe
Combined Cycle Power Plant Repowering
Modernization of Steam Turbine and Generator Control and Protection System including
new I&C and new Mechanical Scope; Steam Turbine Hall Mechanical Rehabilitation Works;
Implementation of Plant DCS System; Plant Field Instrumentation; Supply of LV Systems and
Installation & Commissioning of Whole Electrical Balance of Plant
2012
ATAER ENERGY
Izmir 60MWe Combined Cycle Power Plant Extension
Supply, Erection, Commissioning of Heat Recovery Steam Boiler (OTSG), air cooled condenser;
complete plant engineering; plant control system supply & implementation
2010
ENTEK ENERGY
Izmit 60MWe Combined Cycle Co-generation Plant Extension
Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG) and
electrical/mechanical Balance of Plant including equipment foundations & complete civil works;
complete plant engineering & control system extension
2009
OYAK EKON PROKON
Kayseri Bogazliyan Sugar Factory
Engineering, procurement, erection and commissioning of 2x Steam Boilers (75T/h ea.),
2x Siemens Steam Turbines (8.2MWe ea.) & auxiliaries including boiler control system
2007
UNIT INTERNATIONAL
Rudeshur 750MWe Power Plant
Commisioning of instrumentation and Control System of 3x Siemens SGT 5- 4000F GT Power Plant2005
AKENERJI
Yalova Power Plant
Start-up & Commissioning of 3x 120 t/h H DUal fuel steam boilers, 2 x HSRGs2004
AKENERJI
Uşak Power Plant
Start-up & Commissioning of 3x 11 t/h HRSGs2003
AKENERJI
Denizli Power Plant
Start-up & Commissioning of 2x 11 t/h HRSGs2002
Showing entries (filtered from total entries)

Automation References

Customer / ProjectProject ScopeYear
UGUR ENERGY
Cerkezkoy Combined Cycle Power Plant
Automation of of CCPP including
1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG),
1X Steam Turbine and BOP;
Design, Implementation, Supply and Start-up
2011
ATAER ENERGY
Izmir Combined Cycle Power Plant Extension
Automation of CCPP extension including
1X Gas Turbine,
1X Heat Recovery Steam Boiler (OTSG) and BOP; Design,
Implementation, Supply and Start-up
2011
AKENERJİ
Uluabat Hydroelectricity Power Plant
Wireless Data Communication Project
2011
TERMO HEAT
Sivas-Kangal EUAS Power Plant
Implementation, Start-up & Commissioning of Siemens S7-3XX Boiler Control System
2011
ISTAC
Odayeri Waste to Heat Plant
Control System Re-programming, Implementation, Start-up and Commissioning of
1X Fired Steam Boiler Burner Management System with Combustion Control; and BOP
2010
ENTEK ENERGY
Bursa Power Plant
RF Data Communication System, Design, Supply and Commissioning.
2009
ENTEK ENERGY, Turkey
Izmit Combined Cycle Co-generation Plant
I & C Engineering and Commisioning Supervision of CCPP extension including
1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), and BOP.
2009
ISKENDERUN IRON & STEEL FACTORY
O2 Pressure Reducing Station
Instrumentation & Automation of Slab Casting O2 Gas Pressure Reducing System,
Supply and Start-up
2009
ADVANSA
Adana Power Plant
Control System Implementation and Start-up for CIPS Transfer System
2009
OZG ENERGY
Hamitabat Power Plant
Fuel oil Storage and Distribution System Instrumentation Engineering and Supply
2008
ADVANSA
Adana Power Plant
2X HT Boiler Control System Design, Engineering including Burner Management System and Start-up
2008
DOGA ENERGY
Bahcesehir Power Plant
Monitoring System for Liquid Fuel Pressures of the Gas Turbines
2008
ENERJISA
Izmit Combined Cycle Power Plant
Isochronous Mode Scenarios Between Generators, Load Sharing, Load Shedding Automation
2008
ISKENDERUN IRON & STEEL FACTORY,
Water Network Control & Monitoring
Electrical, Automation, Instrumentation and Control Works
2008
KONYA SUGAR
Cumra Sugar Factory
Electrical Systems & Automation of Pulp Drying Facility & Thin Juice Decalcification Unit and Lime Kiln
2008
AKENERJI
Aksa Akal Factory
ABB Remote Terminal Unit (RTU) Data Exchange System
2008
SCA SELKASAN
SCA Selkasan Manisa Power Plant
Automation of Steam Boiler, Heat Recovery Steam Boiler and BOP;
Design, Engineering including Burner Management System, Implementation, Supply and Start-up.
2008
ISKENDERUN IRON & STEEL FACTORY,
Slab Casting Plant O2 Pressure Reducing Station
Turn-key Design, Implementation, Supply and Start-up of 6X O2 , Ar,
H2 Pressure Reducing Stations, Control & Monitoring System,
Pressure Reducing Station; Instrumentation & Automation of Slab Casting Gas Pressure Reducing System,
Supply of additional operator stations
2007
SADELMI SPA
Aliaga Power Plant
Distributed Control System (including site services), Supply, Engineering,
Commissioning & Start-up of Heat Recovery Steam Boiler
2007
TERMO HEAT
Agri Sugar Factory
Burner Management System for
2 X Double Fuel Burners,
4X Single Fuel Burners,
Boiler Control Syatem for 4X Boilers (Siemens S7-300)
2007
CERKEZKOY & NAR ENERGY
Cerkezkoy 48MWe Co-generation PP Plant
Design, Supply, Engineering,
Commissioning & Start-up of Distributed Control System.
2006
AKENERJI
9X Co-generation Power Plants
Supply, Engineering,
Commissioning & Start-up of Distributed Control System for 9 power plants
2002
2006
ERDEMIR
Oxygen Plant # 5
Modernization of Distributed Control System
2006
HABAS
Aliaga 230MWe Combined Cycle Power Plant
Distributed Control System, Supply, Engineering, Commissioning & Start-up
2006
OYAK EKON PROKON
Kayseri Sugar Factory Power Plant
Complete Power Plant Distributed Control System,
Supply, Engineering, Commissioning & Start-up
2006
MILTEN
Boiler Automation System
2006
GAZ TEKNIK - SASA
Adana Polyesther Industrial Plant
Burner Management System for 11X Double Fuel Burners,
Individual Vaporizer for Control System & Redundant,
Master Control System for 9X Vaporizers
2005
SISECAM GROUP SODA INDUSTRY
Burner Replacement of 3X Boilers
Distributed Control System, Supply, Engineering, Commissioning & Start-up
2005
KAREGE
Kemalpasa Power Plant
Distributed Control System, Supply, Engineering,
commissioning & Start-up of 3X HRSG & Balance of Plant
2005
OZTAS
Etibor-Emet 10MWe Co-generation Power Plant NG Conversion
Distributed Control System, Supply, Engineering,
Commissioning & Start-up of HRSG, Balance of Plant & 34.5 kV Switchyard Systems
2005
GAMA POWER SYSTEMS
Adana Power Plant
Design, Supply, Implementation of Boilers Control Systems and Boiler Management System
2005
Showing entries (filtered from total entries)

© Copyright 2022 BGM.