Customer / Project | Project Scope | Year |
---|---|---|
IC-Limak Yeniköy Kemerköy Coal Fired Power Plant (group ref.with GKE Energy) | Rehabilitation on EPC Turnkey basis of 1050 MW thermal power plant. | - |
Azerenergy Janub 750 MW Combined Cycle Power Plant (group ref.with GKE Energy) | Erection Supervison, Commissioning and Start up. | 2014 |
EUAS Ambarlı 810MWe Combined Cycle Power Plant | Modernization of Steam Turbine and Generator Control and Protection System including new I&C and new Mechanical Scope; Steam Turbine Hall Mechanical Rehabilitation Works; Implementation of Plant DCS System; Plant Field Instrumentation; Supply of LV Systems and Installation & Commissioning of Whole Electrical Balance of Plant | 2012 |
ATAER ENERGY Izmir 60MWe Combined Cycle Power Plant | Supply & Erection of Heat Recovery Steam Boiler (OTSG), air cooled condenser; complete plant engineering; plant control system supply & implementation of the extension of existing power plant | 2010 |
ENTEK ENERGY Izmit 60MWe Combined Cycle Co-generation Plant Extension | Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG) and electrical/mechanical Balance of Plant including equipment foundations & complete civil works; complete plant engineering & control system extension | 2009 |
DOGA ENERGY Natural Gas Heating System | Supply and installation of natural gas heating system for 3X GE Frame 6 Gas Turbines | 2008 |
CTU CONSORTIUM, Switzerland
Bromine Recovery Unit Plant | Design and manufacturing of heat recovery steam boiler (6T/H) | 2008 |
SKODA POWER, Czech
Erdemir 40MWe Steam Turbine Generator Extension | Civil works including elevated steam turbine foundation, power house building, control building, HDPE sea water cooling lines, cable & pipe bridges | 2007 |
EKON, Turkey
Askale Fuel Oil Treatment Plant | Engineering, manufacturing, installation and commissioning of fuel oil treatment plant | 2007 |
OYAK EKON PROKON, Turkey
Kayseri Bogazliyan Sugar Factory | Engineering, procurement, erection and commissioning of 2X Steam Boilers (75T/H ea.), 2X Siemens Steam Turbines (8.2MWe ea.) & auxiliaries including boiler control system. | 2007 |
MASTIR ENERGY, Turkey
Eren Corlu Power Plant | Engineering, supply, installation and commissioning of Dearator (53m3) for steam boiler (135T/H). | 2007 |
ENERJISA, Turkey
Kentsa Power Plant Auxiliary Boiler Extension | Design, manufacturing, supply & installation of heating coils for auxiliary boilers | 2006 |
CERKEZKOY & NAR ENERGY Cerkezkoy 48MWe Co-generation Power Plant | Turn-key construction of GE LM 6000 Gas Turbine, Heat Recovery Steam Boiler (OTSG) and electrical/mechanical balance of plant including equipment foundations and complete civil works; complete plant engineering & control system supply; 5 km self isolated underground steam distribution piping, instrumentation & control sys. | 2009 |
SISECAM GROUP SODA INDUSTRY Burner Replacement of 3X Boilers for Mersin Soda Factory | Replacement of 11X fuel oil burners of 3X boilers (460T/H total) with Natural Gas, including all fuel trains & control system | 2009 |
Customer / Project | Project Scope | Year |
---|---|---|
PALMET ENERGY 60MWe Combined Cycle Power Plant | Simple & Combined Cycle Power Plant Engineering, Project Management | 2012 |
EKON PROKON Ambarli Repowering | Basic Detailed Engineering of 2X Siemens SGT 5- 4000F GT, 2X HRSG, Rehabilitation of 2X 150MWe existing Steam Turbines | 2012 |
ZORLU ENERGY Luleburgaz 65MWe CCPP Extension | Basic and Detailed Engineering of GE LM 6000 GT, HRSG, Steam Turbine, ACC and Auxiliary Equipment | 2011 |
AKSA ENERGY Antalya 1000MWe Power Plant | Basic & Detailed Engineering of 4X GE LM 6000 GT, 4X HRSG (OTSG), 2X GE ST, 2X Siemens SGT 5- 4000F GT, 2X HRSG, 250MWe Steam Turbine, Cooling Systems & Auxiliary Equipment | 2011 |
UGUR ENERGY Cerkezkoy 65MWe Combined Cycle PP | Simple & Combined Cycle Power Plant Engineering, System Siemens PCS7 Plant Control System Supply | 2010 |
ATAER ENERGY Izmir 60MWe CCPP Extension | Basic and Detailed Engineering of GE LM 6000 GT, HRSG (OTSG), Steam Turbine, ACC & Auxiliary Equipment | 2010 |
ENTEK ENERGY Izmit 60MWe Combined Cycle Co-generation Plant Extension | Complete Combined Cycle Power Plant Engineering | 2009 |
SADELMI SPA Entek Power Plant Relocation | Basic and Detailed Engineering for relocation of ABB GT, Heat Recovery Steam Boiler from Izmit to Tupras Aliaga | 2007 |
ZORLU ENERGY, Russia
Kozhukhovo, Tereshkova 2X 170MWe Combined Heat & Power Plants | Engineering Management Services for Combined Heat & Power Plants | 2007 |
AKSA ENERGY Samsun Power Plant | Stress Analysis for DN300 Steam Piping | 2007 |
OZTAS CONSTRUCTION Botas Corum Natural Gas Compressor Station | Engineering Services for Corum Natural Gas Compressor Station | 2007 |
BOSEN Bursa 63MWe CCPP Extension | Basic and Detailed Engineering of GE LM 6000 GT, HRSG, Steam Turbine, cooling system and Auxiliary Equipment | 2006 |
ERGAZ Enerjisa Adana Combined Cycle Power Plant | Detailed Engineering of 2X GE Frame 6 B Gas Turbine Inlet Air Cooling Systems (chiller) | 2006 |
CERKEZKOY & NAR ENERGY Cerkezkoy 48MWe Co-generation PP | Basic and Detailed Engineering of GE LM 6000 GT, Heat Recovery Steam Boiler (OTSG), Underground Steam Distribution Piping | 2006 |
GAMA POWER SYSTEMS, Entek Bursa & Iztek Izmit CCPPs Erdemir Power Plant Tupras Izmit Refinery | Design, Engineering and I & C of Heat Recovery Steam Boilers | 2006 |
CALIK ENERGY, Turkmenistan
Buzmein Combined Cycle Power Plant | Basic Engineering for proposal | 2005 |
Customer / Project | Project Scope | Year |
---|---|---|
OMV, Austria
Samsun Power Plant | Long Term Service agreement for the
Plant Control and Instrumentation, Auxiliary Boilers, Heat Exchanging Equipment | 2013 |
AZERENERGY, Azerbaijan
Sirvan Power Plant | Erection Supervision, Complete Commissioning of the plant and Start-up | 2012 |
EKON PROKON PROKON, Turkey
EUAS Ambarlı 810MWe Combined Cycle Power Plant Repowering | Modernization of Steam Turbine and Generator Control and
Protection System including new I&C and new Mechanical Scope; Steam Turbine Hall Mechanical Rehabilitation Works; Implementation of Plant DCS System; Plant Field Instrumentation; Supply of LV Systems and Installation & Commissioning of Whole Electrical Balance of Plant | 2012 |
ATAER ENERGY Izmir 60MWe Combined Cycle Power Plant Extension | Supply, Erection, Commissioning of Heat Recovery Steam
Boiler (OTSG), air cooled condenser; complete plant engineering; plant control system supply & implementation | 2010 |
ENTEK ENERGY Izmit 60MWe Combined Cycle Co-generation Plant Extension | Turn-key construction of GE LM 6000 Gas Turbine, Heat
Recovery Steam Boiler (OTSG) and electrical/mechanical Balance of Plant including equipment foundations & complete civil works; complete plant engineering & control system extension | 2009 |
OYAK EKON PROKON Kayseri Bogazliyan Sugar Factory | Engineering, procurement, erection and commissioning of
2x Steam Boilers (75T/h ea.), 2x Siemens Steam Turbines (8.2MWe ea.) & auxiliaries including boiler control system | 2007 |
UNIT INTERNATIONAL Rudeshur 750MWe Power Plant | Commisioning of instrumentation and Control System of 3x Siemens SGT 5- 4000F GT Power Plant | 2005 |
AKENERJI Yalova Power Plant | Start-up & Commissioning of 3x 120 t/h H DUal fuel steam boilers, 2 x HSRGs | 2004 |
AKENERJI Uşak Power Plant | Start-up & Commissioning of 3x 11 t/h HRSGs | 2003 |
AKENERJI Denizli Power Plant | Start-up & Commissioning of 2x 11 t/h HRSGs | 2002 |
Customer / Project | Project Scope | Year |
---|---|---|
UGUR ENERGY Cerkezkoy Combined Cycle Power Plant | Automation of of CCPP including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), 1X Steam Turbine and BOP; Design, Implementation, Supply and Start-up | 2011 |
ATAER ENERGY Izmir Combined Cycle Power Plant Extension | Automation of CCPP extension including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG) and BOP; Design, Implementation, Supply and Start-up | 2011 |
AKENERJİ
Uluabat Hydroelectricity Power Plant | Wireless Data Communication Project | 2011 |
TERMO HEAT
Sivas-Kangal EUAS Power Plant | Implementation, Start-up & Commissioning of Siemens S7-3XX Boiler Control System | 2011 |
ISTAC
Odayeri Waste to Heat Plant | Control System Re-programming, Implementation, Start-up and Commissioning of 1X Fired Steam Boiler Burner Management System with Combustion Control; and BOP | 2010 |
ENTEK ENERGY
Bursa Power Plant | RF Data Communication System, Design, Supply and Commissioning. | 2009 |
ENTEK ENERGY, Turkey
Izmit Combined Cycle Co-generation Plant | I & C Engineering and Commisioning Supervision of CCPP extension including 1X Gas Turbine, 1X Heat Recovery Steam Boiler (OTSG), and BOP. | 2009 |
ISKENDERUN IRON & STEEL FACTORY O2 Pressure Reducing Station | Instrumentation & Automation of Slab Casting O2 Gas Pressure Reducing System, Supply and Start-up | 2009 |
ADVANSA Adana Power Plant | Control System Implementation and Start-up for CIPS Transfer System | 2009 |
OZG ENERGY Hamitabat Power Plant | Fuel oil Storage and Distribution System Instrumentation Engineering and Supply | 2008 |
ADVANSA Adana Power Plant | 2X HT Boiler Control System Design, Engineering including Burner Management System and Start-up | 2008 |
DOGA ENERGY Bahcesehir Power Plant | Monitoring System for Liquid Fuel Pressures of the Gas Turbines | 2008 |
ENERJISA Izmit Combined Cycle Power Plant | Isochronous Mode Scenarios Between Generators, Load Sharing, Load Shedding Automation | 2008 |
ISKENDERUN IRON & STEEL FACTORY, Water Network Control & Monitoring | Electrical, Automation, Instrumentation and Control Works | 2008 |
KONYA SUGAR Cumra Sugar Factory | Electrical Systems & Automation of Pulp Drying Facility & Thin Juice Decalcification Unit and Lime Kiln | 2008 |
AKENERJI Aksa Akal Factory | ABB Remote Terminal Unit (RTU) Data Exchange System | 2008 |
SCA SELKASAN SCA Selkasan Manisa Power Plant | Automation of Steam Boiler, Heat Recovery Steam Boiler and BOP; Design, Engineering including Burner Management System, Implementation, Supply and Start-up. | 2008 |
ISKENDERUN IRON & STEEL FACTORY, Slab Casting Plant O2 Pressure Reducing Station | Turn-key Design, Implementation, Supply and Start-up of 6X O2 , Ar, H2 Pressure Reducing Stations, Control & Monitoring System, Pressure Reducing Station; Instrumentation & Automation of Slab Casting Gas Pressure Reducing System, Supply of additional operator stations | 2007 |
SADELMI SPA Aliaga Power Plant | Distributed Control System (including site services), Supply, Engineering, Commissioning & Start-up of Heat Recovery Steam Boiler | 2007 |
TERMO HEAT Agri Sugar Factory | Burner Management System for 2 X Double Fuel Burners, 4X Single Fuel Burners, Boiler Control Syatem for 4X Boilers (Siemens S7-300) | 2007 |
CERKEZKOY & NAR ENERGY Cerkezkoy 48MWe Co-generation PP Plant | Design, Supply, Engineering, Commissioning & Start-up of Distributed Control System. | 2006 |
AKENERJI 9X Co-generation Power Plants | Supply, Engineering, Commissioning & Start-up of Distributed Control System for 9 power plants | 2002 2006 |
ERDEMIR Oxygen Plant # 5 | Modernization of Distributed Control System | 2006 |
HABAS Aliaga 230MWe Combined Cycle Power Plant | Distributed Control System, Supply, Engineering, Commissioning & Start-up | 2006 |
OYAK EKON PROKON Kayseri Sugar Factory Power Plant | Complete Power Plant Distributed Control System, Supply, Engineering, Commissioning & Start-up | 2006 |
MILTEN | Boiler Automation System | 2006 |
GAZ TEKNIK - SASA Adana Polyesther Industrial Plant | Burner Management System for 11X Double Fuel Burners, Individual Vaporizer for Control System & Redundant, Master Control System for 9X Vaporizers | 2005 |
SISECAM GROUP SODA INDUSTRY Burner Replacement of 3X Boilers | Distributed Control System, Supply, Engineering, Commissioning & Start-up | 2005 |
KAREGE Kemalpasa Power Plant | Distributed Control System, Supply, Engineering, commissioning & Start-up of 3X HRSG & Balance of Plant | 2005 |
OZTAS Etibor-Emet 10MWe Co-generation Power Plant NG Conversion | Distributed Control System, Supply, Engineering, Commissioning & Start-up of HRSG, Balance of Plant & 34.5 kV Switchyard Systems | 2005 |
GAMA POWER SYSTEMS Adana Power Plant | Design, Supply, Implementation of Boilers Control Systems and Boiler Management System | 2005 |